Answer Posted / sree
Voltage regulation is given by an expression (no load voltage- full load voltage)/no load voltage
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .
Is there any abbrevation for STUB in Stub bus protection
why power not passes in plastic and rubber material
What are test signals and their significance?
what is the difference between transformer,converter and transducer
how works inductive &capacitive sensors?
how many types are their in switchyard or substation(like D,I TYPE), what is differant between them
Draw the DOL starter and star delta starter drawing?
Can anyone explain me about the capacitor calculation
How to design the earth grid for lightning protection in an industry
what happens if dc supply is given and the remedies for it.
DEAR SIR,I GOT THE CALL LETTER FROM RRB, SECUNDERABD AS A JE-II SO PLEASE PROVIDE ME SOME MODEL QUESTION AND ANSWER PAPERS AND LAST YEAR QUESTION PAPERS
What is an order of a system.
Hi everyone, I'm Lachuu, recently joined automation company as PLC Engineer. I have certain basic question, I request all big gurus and seniors to answer these question. Because this will be very helpful to me as well starters like me. How to design a control circuit (ex: pick & place - my current project) Yamaha robot PxYx series controller RCX222, using 6 cylinder double acting, plc keyence kv p16r 2 expansion unit for input and output each. How to select panel terminal mcb elcb powersupply. My main concern in some projects how to select dc power supply, mcb rcb(I came across dif bt b c d curves, but stil confusing, pls help me :-(. I would really appreciate all who are going respond to this question.
1) What are your personal strength? 2) What are your personal areas of improvement? 3) What are your expectations from from a particular job? 4) what are your carrier objectives?