Answer Posted / gowtham1993
Procedure
1. Clean the site
2. Make level the site and provide slope in leveling to drain water
3. Fill the sand
4. Made correct with the first line and keep on laying
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
Please let me know what is the simplest way of Calculating Mix Designs
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
Which is the direction of negative angle?
Why should appointment store person for project ? what is the benefits for company ?
how water proof chemicals act in concrete to avoid leek?
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
Describe the various methods of concrete curing?
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
material used for mendrel use to bend epoxy coated rebar
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
What are the main reasons for conducting pull-out tests for soil nails?