Answer Posted / gowtham1993
Procedure
1. Clean the site
2. Make level the site and provide slope in leveling to drain water
3. Fill the sand
4. Made correct with the first line and keep on laying
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
how can we calculate steel value, depending on load
how to create our resume?
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
Define What is the distance between railway tracks?
What is Refuse Area In High Rise Building ?
how to compute slab reinforcements on step by step procedures??
Which are the Steel tests ?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
what are the duties of Site Engineer in work site?
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
How to calculate the crank rod in slab
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
What are the types of slump?
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
Define Who designed the city of Washington DC?