Answer Posted / gowtham1993
Procedure
1. Clean the site
2. Make level the site and provide slope in leveling to drain water
3. Fill the sand
4. Made correct with the first line and keep on laying
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
How do you prepare Material Recovery Statement for deduction from contractors bills?
Explain what are the phases inspections are done by local authority while construction?
Permissible wastage of cement as per IS code ? In which IS code I get it?
what are the types of design? which type of method is used at what type of design & why?
What difference comes in constructing of house and a housing complex like society
What is the difference between Fe 500, Fe 500 D and Fe 515.
How long does it take concrete to harden?
Which are the top apps for you civil engineer?
What is the difference between Hinged and pinned in Column ends
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
how much percent are used 20mm,10mm?
Explain the Strength of brick?
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
How did street originate in the plumbing term street ell?