Answer Posted / gowtham1993
Procedure
1. Clean the site
2. Make level the site and provide slope in leveling to drain water
3. Fill the sand
4. Made correct with the first line and keep on laying
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
Please tell me vasthu room sizes. Thanks.
rate analysis hiring of generator 62.5 KVA
How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.
What is quantity of cement and sand required for 2000sqft of tiling?
which red: used in roof teping, then use only cement
Civil engineering material testing Standard results
What is the crank length in the slab?
How can we make a hole in a solid rectangle using solidsworks?
What is bmc stands for in bmc software?
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
What tor stands for in tor steel?
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
What are your goals?
Who name us Engineer & Why?