Answer Posted / gowtham1993
Procedure
1. Clean the site
2. Make level the site and provide slope in leveling to drain water
3. Fill the sand
4. Made correct with the first line and keep on laying
Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
How foundation is designed, Column design and beam design
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
what is the function of GSB all class ?
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
what is differences between ferrock and concrete ?
How many feet are in 4 square yards?
List out some of the checking’s, done at the completion of construction?
Explain what is zoning permit?
How much does the leaning tower of pisa lean?
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
Forces in a Shear Wall are in plane or out of plane ?
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
explain what do you mean by the property development.
Permissible wastage of cement as per IS code ? In which IS code I get it?