Answer Posted / deshmukhcwm
it is drilling & grouting process for RCC work .
| Is This Answer Correct ? | 12 Yes | 3 No |
Post New Answer View All Answers
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
whats is difference between anchorage length and development length
whaat is blister in box girder bridge and what is its function..
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
Explain what are the phases inspections are done by local authority while construction?
What in your past experience or education prepares you for the position for which you are applying
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
What are wooden shingles?
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
How to design staircase.plz tell me formula for the design the staircase.
what is the clear cover for shearwall?
How many feet are in 4 square yards?
hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft
What are the different methods for drawing an arc?