how to find the cement and sand quantity for wall plastering
Answer Posted / er.ssmanian007@gmail.com
plaster = suppose 12mm palster
consider 1 sqm ratio is 1:6
volume of concrete= .012x1= .012cum ( per 1sqm)
incrase 20% for joint, filling and wastage=.012*20%=.0144
calculate 1/3rd of mortar when
dry= .0144*1/3+.0144= .0192cum
summation of ratio = 7
cement= .0192/7=.00274cum
= .0789bags
sand= .00274*6=.0164cum
this formula applied for 6mm and 20mm
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
How do you prepare Material Recovery Statement for deduction from contractors bills?
what are the code used for residental building?
What are your future hopes for this job?
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
rate analysis for cement pointing 1:4 , for 100 sq m
What is c.g.i sheet which used for roof??
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
Define Workability ?
Explain what is Hybrid Foundation?
TELL ME THE EQUATION FOR OGEE SPILLWAY
how to stop beam concrete between column
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
how to calculate the size of triangular ring in rcc column?
What is meant by a context menu in a cad software?
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2