adspace


lap length formula

Answer Posted / setti durgababu

its mainly depends up on type of loading subjected to particular member that is tension or compression
as a commonsense for tension more laplength is req than compression

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Technical Question of Civil Engineering

2358


Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com

2102


HOw much % of premium on DSR-2013 currently

2051


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

2314


Draw a neat sketch showing the 'throat' of a welding in a plate girder ?

2546


can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.

2236


please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.

2400


400 ku d/c clearess ketan hota hai?

2124


cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com

2264


pls mail some more tecnical qustions at msaranya2610@gmail.com

2184


Why do you want to work here

2451


What is the strength of 1:6:12 mix?

3159


manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.

1842


PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg

2425


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2237