what"s the formula find the cement consumption for brick
work 12 thick wall 1 m2?
Answer Posted / dj_mgood
It's Depend on ratio of morter.
formula is very simple.
Quantity of wet material x 1.27 = Dry morter,
Example, let suppose wet material is 100cft then
100 x 1.27 = 127cft
requied material / some of ratio
if morter is 1:4 then
1/5 * 127 = 25.4 cft
25.4/1.25 = 20.32 say 21 bags
if thickness of plaster is 1/2" then it cover 508sft Area.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
plz.show development and anchorage length in simple diagram.
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
how can we calculate steel value, depending on load
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
water leak detection system question & answer
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
400 ku d/c clearess ketan hota hai?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
pls mail some more tecnical qustions at msaranya2610@gmail.com
can i get civil engineering test papers.......?????
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?