what"s the formula find the cement consumption for brick
work 12 thick wall 1 m2?
Answer Posted / dj_mgood
It's Depend on ratio of morter.
formula is very simple.
Quantity of wet material x 1.27 = Dry morter,
Example, let suppose wet material is 100cft then
100 x 1.27 = 127cft
requied material / some of ratio
if morter is 1:4 then
1/5 * 127 = 25.4 cft
25.4/1.25 = 20.32 say 21 bags
if thickness of plaster is 1/2" then it cover 508sft Area.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What are the problems one might face while having a Cantilever balcony?
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
How do you change a dimension value in solidsworks?
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
Define mirror?
What are your goals?
What is meant by a context menu in a cad software?
How can i do RCC rate analysis?
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
what isload waring calculation
what is the basic difference between Coloumn & Shear Wall
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh