Why is loose concrete removed from the surface where new concrete is to be done?

Answer Posted / amaregouda

To avoid the formation of micro cracks in construction joint and as well as to provide a proper bond between old and new surfaces.Usage of bonding chemicals is advised like nitto bond.

Is This Answer Correct ?    8 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is difference between engineering stress and true stress?

660


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

1268


What is the name of this multiplication factors ?

1699


What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete

6241


What is the snap size in civil and how can we create it?

2300






how much of the strength comes from post-production curing

2257


which red: used in roof teping, then use only cement

1553


what is the weight of 6000 psi concrete in lb/cft?

3092


what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15

2499


How to design staircase.plz tell me formula for the design the staircase.

1393


What is the difference between one-way slab and two-way slab?

654


An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.

1544


to draw bm diagrams for portal frames under different loadings//

2434


How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel

1379


. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.

1943