Answer Posted / shamshair ali
the temporary support provided to the form work for supporting component parts of an arch, dome or other roofing structure is called centering
the temporary support beneath and at the sides of precast or cast in-situ concrete work is called shuttering.
| Is This Answer Correct ? | 6 Yes | 4 No |
Post New Answer View All Answers
what is the exact dia of 8swg and 10swg gabion wire
how to calculate the strength of rebound hammer test reading in building construction ?
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
Define aligned dimension?
how to calculate the size of triangular ring in rcc column?
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
how can we construct building without foundation providing only grade beam at ground level
Difference between lime, distemper and plastic emulsion?
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
Explain the different types of roofing systems?