Answer Posted / shamshair ali
the temporary support provided to the form work for supporting component parts of an arch, dome or other roofing structure is called centering
the temporary support beneath and at the sides of precast or cast in-situ concrete work is called shuttering.
| Is This Answer Correct ? | 6 Yes | 4 No |
Post New Answer View All Answers
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
Dear Sir What is the Contraction joint for base Slab
How to calculate brick work quantity?? Block work quantity??
How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.
Which is the direction of negative angle?
Explain what are the skills required to become an architect?
What is binding spacing of the rebars at lapping zones.
what is Brick crushing strength(PSI)?
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
what is the weight of 12mm aggregates?
What is difference between engineering stress and true stress?
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
rimmer in pile foundation
which red: used in roof teping, then use only cement