Post New Answer View All Answers
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
Explain what is the difference between built area and super built up area?
How to hide dimensions in autocad?
how many time use of plywood shuttering and IS code
how to calculate the steel in 500yard
The largest size of paper used in plotter to print the drawing made by Autocad .
What is the exception critarea of cube?
How to calculate Volume of Wet cement concrete for a specific grade?
What is the difference between shear and tensile strength?
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
how much cement sand n bricks required in im3?and how much in plaster?
Explain different types of rcc pipes.
How much does the leaning tower of pisa lean?
When was the first motorway built in england?