Lube oil pressure transmitter local it's showing 9.8 kg/cm2 but dcs side it's showing 9.26 like that what is the reason?
Answer Posted / karthisampath
It may be forced
Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
what is loop1 and loop2 in MTS LT?
how to do dynolab wind speed sensor loop test, how to simulate value,i have simulate mA 4-20mA but not responding in DCS faceplate, please kindly advice me any one.
What is the PLC configuration in Cement industry?
I am using 971 Enraf radar level transmitter for LPG tanks ,the tank side indicator gives the error code 999999999FL can any body give me any diagnostic for this issue?
Can any body help to get Rsemulator 5000 free from internet if possible then give me any link or any help .
which processor is used in dcs.
what is function of SCADA , and how is it work, explain with difination
What is the use of temperature compensation?
What are the uses of orifice plates?
how to tune siemens sipart electro pneumatic positioner..plz tel me..
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
what is the different between deflection type measurement and null type measurement in RTD?
Why is the orifice tab provided?
please tell no. & add. of consultancy who recruit me in power plant as instrumen engg. present i m working in power plant as ass.t instrument engg. thanku mahesh 09226562826
Who to difference between analog in & analog out in dcs?