Answer Posted / abiraj07
Brick=1600kg/m3
Cement=1440kg/m3
Challe=220kg/m3
Glass=2560=kg/m3
Lime stone=2650kg/m3
Sand stone=2800kg/m3
Steel =7850kg/m3
Timber=750-720kg/m3
Water=1000kg/m3
| Is This Answer Correct ? | 10 Yes | 1 No |
Post New Answer View All Answers
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
What is a kip?
types of piles detail,
pile load testing procedure
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
Why do you want to work here
What is componsation
What are the benefits of rcc pipes over steel designed pipes?
how to nfind out the specific gravity of sand.aggregate,water please help...
Which are the top apps for you civil engineer?
What is the use of offset command?
how much repeitation for conventional and maivan formwork?
What is packing Factor ?
What are the basic use of runners and standards of pipelines?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .