How to calculate 45 degrees bend Steel bar length in Slab
Reinforce ment
Answer Posted / usman hanif
Height of bend half height of band
Is This Answer Correct ? | 5 Yes | 7 No |
Post New Answer View All Answers
What does a construction cost covers and what does not?
60-70 grade of Bitumen is VG-30 ?
How to arrive dry volume of concrete (1.52 to 1.57) ?
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
Trapezoidal section footing calculation of Volume & its Area
what is conrete grade ,how are depent on concrete grad and size of concrete?
How can we convert weight batch to volume batch for m30 mix
how will remove spiderweb cracking in plaster ? what the reasone of make it ?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
what is parametre for M25 after 7 days strength
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
what is the hanekom repairing material after concreting work
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
What is Rankine Cycle?