what is a mix design GSB and WMM
Answer Posted / om prakash
GSB= Granular Sub Base and WMM= Water Mixed Mecadum
Is This Answer Correct ? | 13 Yes | 10 No |
Post New Answer View All Answers
how to shuttering is used in slab
pls mail some more tecnical qustions at msaranya2610@gmail.com
What is thumb rule for deep trench excavation
In Rcc ratio calculation I wanted to know quantity of Steel also.
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
afe or not
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
what is tension & compression of steel bending.
Why should pumping be not used in case of concreting work?
For Wet Mix Mecadam design what is Optimum moisture content
How we calculate the service time of buildings