what is a mix design GSB and WMM

Answer Posted / om prakash

GSB= Granular Sub Base and WMM= Water Mixed Mecadum

Is This Answer Correct ?    13 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to shuttering is used in slab

1316


pls mail some more tecnical qustions at msaranya2610@gmail.com

1695


What is thumb rule for deep trench excavation

1314


In Rcc ratio calculation I wanted to know quantity of Steel also.

1112


show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation

1685






What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2388


What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.

1656


SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?

2241


Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.

691


afe or not

1724


how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?

1996


what is tension & compression of steel bending.

1835


Why should pumping be not used in case of concreting work?

885


For Wet Mix Mecadam design what is Optimum moisture content

1608


How we calculate the service time of buildings

1421