how to calculate bearing capacity of soil
Answer Posted / rushikesh mulik
1 Tarzagi analysis method
2 Standerd penitration test
3 Plate load test
4 Mat floting test
5 it depend on the type of soil like coarse grained soil & fine graned soil
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
what isload waring calculation
What is meant by autocad?
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
how much cement and sand required for 100sqm of wall plastering in different proportions
Define Workability ?
What do you understand by “preset” during the installation process of bridge bearings?
what is the name of shuttering oil used in oman
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
RR masonry rate analysis
Why does the pressure increase under soil?