How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step
Answer Posted / selvaraju
brick = 390 nos as per construction
sand = 0.30m3
cement= 1.90 bags
| Is This Answer Correct ? | 5 Yes | 7 No |
Post New Answer View All Answers
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
Explain what are the skills required to become an architect?
Define What is the force exerted by the Tacoma narrows bridge?
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
how to calculate MR 9(derivation)
how clculate excavated or backfilling quantity by simpson's rule
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
How is the leaning tower of pisa supported?
what post do you prefer to work in this company and why do you think you can serve better in such position?
Mention different types of roof systems?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
what is pouring and explain
what is a well
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
Moisture content calculation for diff mix ratio's ??