Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to calculate quantity of binding wire for any kind of structures.

How to calculate quantity of nails in 1 sq m shuttering.

Answer Posted / farhat abbas naqvi

Binding wire calculation varies from 6kg to 9kg per ton average 7.5kg is taken for practical purpose.
Same way nails varies with the size of member.

Is This Answer Correct ?    16 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are your future hopes for this job?

2300


I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?

2562


what isload waring calculation

2369


What is passive earth pressure ?

1187


Why should appointment store person for project ? what is the benefits for company ?

1108


what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.

2326


when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?

2150


Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?

3016


how to caliculate required amount of cement and sand required for 1cu.m.

2192


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

2257


what is the maximum number of course that can be laid according to IS code and the max height.

2079


for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band

1850


What is the difference between routing maintenance and major maintenance in school facilities?

1114


Specific gravity of cement?

1646


why the openings of sieves are square io size?

1610