What is the maximum allowable 'Silt content' in River sand
Answer Posted / divusp
Max 8% but normally all firms are wanted less than 7% now
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
undistributed samples are obtained by
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
silt%= silt volume/ silt+sand volume is this right?
what are RIB slabs explain about it
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
what is diversion?
what is the weight of 12mm aggregates?
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
Explain moment of inertia?
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
what is the formula for Mass of cement grout (Dg)=???
How do you calculate the unit weight of concrete?
how many tonnes equals to one cubic feet?