Answer Posted / ismail

M5-1:5:10
M7.5-1:4:8
M10-1:3:6
M15-1:2:4
M20-1:1.5:3
M25-1:1:2
M30,m40-design mix.. 

Is This Answer Correct ?    23 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

explain the advantages of total stasion

1691


I need old MMUP exam question and answer for Civil engineering

1163


What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.

4221


GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.

2046


what do you know that m20,m25

1405






How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction

2650


what is flexible and rigid footing?

1858


What are the advantages of cad software?

667


What is a kip?

729


what is w/c ratio in dry lean concrete for m10 mix design

7995


in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?

1852


What are the uses of layer?

738


1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...

1637


please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)

1361


I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.

1554