Answer Posted / achal
Class 2 co-ordination?
As you have not clearly specified we assume it as Insulation Co-ordination hence Class 2 is the protection level (i.e. ability to withstand current capacity).
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is (+) and (-) in generator field detector stand for?
How to calculate Air conditioning capacity for a telecom BTS shelter?
what are the advantages and disadvantages of oil filled cables over XLPE cables
What are the differences between single phase and three phase?
how we test a 3 phase motor on single phase supply....? HOW WE RUN A 3 PHASE MOTOR ON SNIGLE PHASE. supply for testing..? how we verify of a 3 phase motors 6 wire & name thame a1/a2/a3..b1/b2/b3 and c1/c2/c3 for connecting star delta starter ........i have only 1 phase supply ? help forum..........
What should be the voltage between Neutral and Ground in secondary side of the step down transformer (230 V to 110 V) with no load condition?
condition Autotrip facia come on control panel of electrical transmission line?
What is ramp signal?
what is the terminal voltage of dc series generator running at rated speed at no load?
In single phase ac ups supply when current is measured with tong tester neutral current is found more than phase current.What is the reason?
Can you explain about TEE protection scheme?
Why frequency changes due to load variation in power system ? i.e why when load increases frequency decreases?
what is differentila pilot supervision in the incomer control panel in the power station?
How to calculate the Efficiency of Chiller
direction of tarbine& genrator