Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

i wanted to know the quantity of cement and water cement ratio for 150mm*150mm*150mm mould.Grade of concret m20

Answer Posted / karthik

Cement - 0.02916kg

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

material used for mendrel use to bend epoxy coated rebar

2235


how much one carpenter can doing shuttering of slab in one day

3286


if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.

1995


What is meant by scaffolding coefficient?

2598


How much is the cover for slab?

1210


List out some of the checking’s, done at the completion of construction?

1145


what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght

1377


Which is the direction for positive angle?

1210


Why steel rods are produced only in even dimensions?

2548


What is the Maximum %age of Steel in columns and beams ?

1231


How much cement will require for 1Rmt Skirting laying

2258


Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?

2415


the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum

1988


how to calculate testing date

1641


Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3

1998