why we use the 4-20 mamp signal used for transmitter.
Answer Posted / siddhesh
4-20 signal is Intrinsically safe vale of current. also it dose not get affected with EMI.
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
give me all the details about the interview and which type of question being asked
hello friends, can you please send me the model paper or question paper to be prepared for hpcl examinations????????? You can mail me at rahim_here@yahoo.com waiting for your reply........... help me .. plz.....
this site is owned by an nonsense
Good evening all I need a small favour regarding reliance paper i wanna probable sample papers(e&i) of reliance. if any of u have any idea about dis then plz mail me back.i belongs to electronics and instrumentation engg.so i need e&i papers. thanking u....
sir, give me placement papers and interview quistion of birla group company of copper.
sir i m preparing for BARC but i am not getting any papers to prepare for this exam so please send me some sample papers to my i.d for the preparation of barc.
please any body have most important data for study for saudi aramco test of instrument QC thanks email shahnaveedullah@gmail.com
hi sir yhis is zahid ali i am preparing for the jspl at oct.4.please send me the recently updated sample paper.
send me last 5 years questions asked in rrb chennai, for section engineer
any one can send me instrumentation previous interview papers? I prepare for MNC Company Interviews? my mail id- Rakesh.Golla@dodsaldxb.ae , and another mail rakesh.gvk@gmail.com
pls suggest suitable MOC of diaphragm for pressure measurement of UREA grade solution service fluid.
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
I am manjunath having exp in maintenance of chemical plants,know i want to do a design course INTOOLS,after doing design course can we get jobs in design field.sinve i dont have design exp..
plz you help about Que paper of mahagenco previous your,any model paper relad to it{maharastra power genration}
please tell no. & add. of consultancy who recruit me in power plant as instrumen engg. present i m working in power plant as ass.t instrument engg. thanku mahesh 09226562826