Answer Posted / shadavali123@gmail.com
The mix design r m30 to m80 is called design mix
| Is This Answer Correct ? | 8 Yes | 4 No |
Post New Answer View All Answers
How to cal. The weight of hollow pipe?
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
What is OSHA compliance?
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
Define What is the force exerted by the Tacoma narrows bridge?
What is the substitute of Mastic Asphalt?
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
what is the price of a cubic meter of concrete on international market?
How you can use different dimension tools in cad? What are the different dimensions available?
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area