What should be percentage of silt content in sand?
Answer Posted / surendra
2
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the exception critarea of cube?
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
how to find out hard strata in bored pile when the DMC method adopted.
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
how we calculate the vol.of wet concrete..?
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
How do You Maintain a structure after getting cube test of low strength.
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
what is total volume of ingredients used in concrete accordingly
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
What is quantity of cement and sand required for 2000sqft of tiling?
How much cement,sand,bricks and water needed for 1square metre brick work?
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot