what are the steps of syncronizing the generator with an infinite grid?
Answer Posted / npti.pe
1st match the voltage and freq of gen. and grid, then using a synchro-scope match the phase while closing the GCB
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
By any way can we increase the B check hours from 300 to 500
dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job
what is restricted earth fault explain in details
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
operation
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
what is the trip circuit supervision in an electrical meaning?
How We Calibrate the vaccum transmitter?
What is difference between secondary Air & Tertiary Air and Their use.?
im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much
our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....
can dp type level transmitter work in under vaccum condition
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
what is the difference between compensated & normal drum level in boiler drum?
what is natural frequency of turbine shaft .