1) one brass of stone aggregate 20mm is good for how much sq.ft. work of concrete beam and 2) one brass of river sand is good for how much sq.ft. work of concrete beam . if ration is 1:4:6. at the same time how many bags of cement will be required for same work if each bag is of 50 kgs . please help me.
Answer Posted / harsh patel
1 Brass = how tone 20 mm aggregate
Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
Can we use the flyash bricks in brick bat coba?
What are moment of inertia and its importance in civil engineering?
What are the advantages of cad software?
how calucate cement sand ratio for plstering
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
How many days should curing of plastering, brick work and concrete
how u design STAGING for Superstructure in BRIDGE construction?
Explain the difference between slab and beam?
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
How to check slab shuttering level.? Or check list for slab ?
Rate analysis of Vitrified tile in cement mortor 1:3
Why are pull-out tests performed for soil nails?
what will be price of 1:2:4pcc per kg?
what is m30 in concrete tiles
Explain the importance of moment of inertia?