how much % of cement can be replaced by flyash ....
Answer Posted / ankush yadav
13%
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
What is 1/8 on the architect ruler denotes?
What is quantity of cement and sand required for 2000sqft of tiling?
Who designed the city of washington dc?
Prepare a Schedule for a Highrised building from starting stage to Handover?
acceptance criteria for concrete works
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
What do you meant by gui?
Which purpose we use deck anchor in bridges?
All aptitude question of Bechtel
HOw much % of premium on DSR-2013 currently
How to calculate carrying capacity of the existing water supply trunkmain
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
which type of instrument included in plumbing work?name of instrument?