Answer Posted / jagan
http://www.gozuk.com/blog/why-industrial-induction-motor-star-point-not-grounded-803550.html
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.
Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.
How do you consider that you can improve and what assistance do you need to achieve this
How We Calibrate the vaccum transmitter?
Why superheated are started before I'd and rd fan?
what is the meaning of SST300 V56A in SIEMENS turbine
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
explain how the third harmonic content of the magnetising current affects transformer design
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
How to calculate power press toneage
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
By any way can we increase the B check hours from 300 to 500
how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?
why airtel use + 24 volts and other operators use -48 volt