I have 3 1000 kva single phase transformers and I wish to replace them with one three phase transformer. What is he kva rating of the new three phase, is it 1000 kva also or 3000 kva.
Answer Posted / sukhvinder poonia
you need to install 1000KVA transformer..because we show the rating every where is of single phase current so three secondary winding also have same 1000KVA capacity.
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
what is the effect of higher value of GD???
how do u gauge the size of the cable ?for eg. consider a 300 sqmm L.T Cable.How do u determine the size of the cable seeing it pratically?
Why do we need a separate control desk & PLC control panel in Boiler plant or coal handling plant? Can we provide cost effective Control desk cum PLC panel. Is there is an specific need for control desk.. kindly advice.
What is the current carrying capacity of 35sq.mm flexible cable?
how to calculate energy of 3-phase motor?
WHAT ARE THE DATAS REQUIRED FOR PROTECTION AND METERING AND CONTROL AND LOGIC PREPARATION,HOW TO STUDY THE PROTECTION AND METERING?
Is there any type of starter for DC motor other than two point,Three point and Four point starters?
what is quality factor in series resonance circuit and calculate the factor of voltage magnification? how it happens?
what happen if drive input fail momentry at 48.5 HZ frequency?
solar energy light efficiency & disadvantages?
if 2 coil of 1000W connect in series and 200 v is applied across it . then what is the total power of coil when coil have only resistive load .
H.t motor 6600 volt to same motor lt supply 440volt supply applyed to h.t motor to effect....
Given a collection of points P in the plane, a 1-set is a point in P that can be separated from the rest by a line; i.e. the point lies on one side of the line while the others lie on the other side. The number of 1-sets of P is denoted by n1(P). The maximum value of n1(P) over all configurations P of 19 points in the plane is 18
WHAT IS THE USE OF PIG TAIL IN WINDOW CT ?
Role of active and reactive Power sharing in between two synchronized Generators, Droop Setting role ?