why prds line tapping taken from ms line as Pri SH O/L temp & pressure is sufficient to full fill our requirement of PRDS..
Answer Posted / mallikarjun
For the safety of secondary SH coils.
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job
operation
what is the basic use of power plant in equipment
explain how the third harmonic content of the magnetising current affects transformer design
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
what is the meaning of SST300 V56A in SIEMENS turbine
what is the difference between compensated & normal drum level in boiler drum?
procedure of how to generate power in solar plant.
why do you consider yourself a suitable candidate for this position
By any way can we increase the B check hours from 300 to 500
im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much
what is the trip circuit supervision in an electrical meaning?