Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the formula for find out the height of chimeny of a powerplant?

Answer Posted / sanky

h=14(q)^0.3

Is This Answer Correct ?    16 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why do you consider yourself a suitable candidate for this position

7381


what is the basic use of power plant in equipment

1671


can dp type level transmitter work in under vaccum condition

1941


how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?

1652


operation

1829


We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?

1856


what does mean by kva rating

1441


what is the difference between compensated & normal drum level in boiler drum?

1738


why airtel use + 24 volts and other operators use -48 volt

2566


How We Calibrate the vaccum transmitter?

1924


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

2413


what's the moog valve

1435


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

943


procedure of how to generate power in solar plant.

1898


What is LB-SR.

2951