What is Automatic interlocking circuit dighram between two contactor for DG SET panel.
Answer Posted / engr muhammad yuonis
To isolate main(WAPDA) supply to DG set supply.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
How much no load current of synchronous motor
An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.
What is critical disruptive voltage?
How to set a Zone 1 distance relay for distribution feeder?
How we can calculate the consumption in kwh of motor on basis of kw @100% load, @50% load & @ no load.
Efficient electrical earthing in hard rock area
Approach of a cooling tower is the difference between temperatures of what factors?
What will happen if we introduce negative feedback to a control system that uses a positive feedback?
Explain with example of functional requirements of protection relay in terms reliability, selectivity, sensitivity
c++ write a program to use a fuction call "max"which accepts an intger arrey of size5.as an arrument and return the larger and smallest of the arrey to main without changing. the original changing of the original position of the element of the arrey.
How is the percentage impedence of a transformer fixed at design stage???
my name is venkat .i have good percentage in my academics(ssc 86, intermediate 83 b.tech 73) my question 1..after completion of my ssc i joined in bpc but i didnt got rank in emcet so i completed MPC in one year compartmentally ..so here what am expect question from this background?
What is super thermal power plant? and how it will differ from normal thermal power plant
what is the minimum recommended leakage current of an earthed cable connected to the body or skid of an alternator
our factory is going under construction mean time transformer 1000 kva 2 nos &load break swithch 12 kv & 4 nos 750 kva 2 nos & 380 kva 2 nos generator to be errcted.how to arrange earth pits &how to earth connect & neutral pit how to calculate in earth bit size.