why we are doing post tensioning in beams and slabs.
it is economical compare to rcc? how?
Answer Posted / faisal amin
Long span + heavy loads is called post tentionig.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
What is the strength of cement?
what is the ingredient value of 40mm and 20mm aggregates?
Which architectural movement is also known as jazz moderna?
What are the ingredients of pre-stressed concrete?
What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
What is meant by engineering drawing?
What is the difference between built area and super built up area?
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
why are you joining in this (applied post) job and your aim for this job
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
How long does it take concrete to harden?
Explain major difference between auto level and dumpy level?