The difference between Centering & Shuttering is –––
Answer Posted / adesh kumar dohare
Generally Centering is used in local language of Form work for slab and Beam casting purpose and But which form work used in purpose of casting of different structure i.e. Slab/Beam/Column and other Structures htat is known as shuttering.
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
1:4:8 pcc calculation 591 cu.ft
Which is the best book for building construction?
Explain the water bound macadam roag
What is the density of most of construction materials?
Why reinforcement done in shorter span in two way slabs
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
explain the advantages of total stasion
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
types of piles detail,
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
States some of the commonly used commands in cad software’s?
how pumping of concrete effects the quantity of material used in it?
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?