Answer Posted / md.tarik rafsan
Fe stands for ferrous and 250 is the yield stress of steel bar. That means the steel bar will gives you warning before failure at a stress equal to 250 N/mm2.
| Is This Answer Correct ? | 30 Yes | 2 No |
Post New Answer View All Answers
What is the likely strength of a 1:2:4 concrete mix?
how to workable concrete cube test M-25 design mix
What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?
how to calculate reinforcment in staircase cranked beam?
what is conrete grade ,how are depent on concrete grad and size of concrete?
What is the standard volume of pharma in cub ft
IS code for Rolling Margin of steel
How can we make a hole in a solid rectangle using solidsworks?
How many square meter can a worker/labor demolish a structure per day?
what radial pressure, the NP2 class rcc pipe can sustain?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
What is alternate bid?
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
How to calculate quantity of plum masonry in 1:3:7
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...