HOW MANY CEMENT BAGS ARE REQUIRED IN 1 CUBIC METER
Answer Posted / mj
its depend on grade.
grade bages
M 20 6.8
M 25 7.5
Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
it is possiblee to produce concrete with out cracks...
what is floating slab foundation?
Hi my name is Binyam and I'm a 7th grader at Mayfield Woods Middle school. I decided to research civil engineering as my career and i need to know a few thing about your profession. What is your daily routine? What are some advantages and things you like about your job? What are some disadvantages What is the hardest thing you have done? What education have you gone through to become a civil engineer? How long is your work day? What is your work environment like? What is your salary? What made you want to become an engineer? What tools do you you use? Thank you for answering my questions
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
What is meant by dimensioning?
what is the calculation of raw material for 0.35cum of m-15
what is the method used for marking of cantilevers in hirise buildings by using theodolite
what is right & short method of measurement of slab&beam
why do we provide haunches in rcc box or underpasses?
why the profile of shell of natural draught cooling tower is hyperabolic.
Which stone is best for wall construction Laterite Stone or Cement Blocks
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C