How to calculate the material for pile 450 mm dia & 300 mm dia with formula find
Cement = ?
Sand = ?
Blue metal = ?
Answer Posted / dfds
3.14 x r x r h
gives vol.
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
pls mail some more tecnical qustions at msaranya2610@gmail.com
I need to constructive work in amaraj batteries
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
what is the 0 value in quantity surveying
material used for mendrel use to bend epoxy coated rebar
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
Which is the latest version of solidsworks?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?