Answer Posted / nitin
Lift should have
- separate button for each floor
- proper ventilation
- light
- Alarm
- Alarm with power backup / battary
- manual option to unlock the door with Key(in case of power outage)
- separate alarm for Over capacity should be there. (capacity check)
- Lift should not move in case of over capacity
- door should open only when lift is not moving
- lift should move only when the door is closed
- in case of power outage lift should work till the nearest floor to unload people /thing
- For automatic door there should be open and close button
- Door should open and close button should work only when lift is not moving
- there should be button on each floor to call lift
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Hi , Please send me the interview questions which were asked in manual testing mainly the test cases asked to write in interview.
Hi Please tell me about ERP Project how do describe in interview Please tell me details about this project my id is chiku_69@yahoo.in
What is the difference between action & script ?
in the account there is 10,000 rupees and i entered 20000, in this case how will you test the application
What is the difference between white box, black box, and gray box testing?
Hi I want to start online training couses for testing Any body plz help me out how to start the online courses Plz post the answer here or send me a mail for kommineni.1020@gmail.com
What is Cyclometric testing?
What are drawbacks in system development life cycle
Can you explain an application boundary?
Being an Manual tester, what will be the role or activity in test plan ?
how will the test plan is pepared in ur organisation>?
Manual and automation how do they help in bringing out quality product? Explain?
What is bug leakage?
what are the possible test cases for online jobs search portal..if its a job seeker module and any 1 if u had worked on this proj pls share the bugs with sev and priority pls frends i need replies for these queries ..thanks in advance
How do you go about testing a project?