How much percent dry volume consider for concrete
Answer Posted / bharath m/8438238335
For 1m3 wet volume concrete,1.57 m3 or 157% dry volume required if mix using 20 mm metal.
and 1.52 m3 or 152% dry volume required if mix using 40 mm metal.
This is based on Experimental Investigations arrived.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
For Wet Mix Mecadam design what is Optimum moisture content
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
what is civil engineer greatest strength and weakness?
How do we calculate absolute pressure?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
what is the steel difference between np-2 and np-3 pipes and weight also
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
Draw the cross section of a boundary wall and label its part with detailing?
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
What is Time period of a building and its relation with frequency ?
What is the likely strength of a 1:2:4 concrete mix?
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
explain the advantages of total stasion
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.