what u mean by M20

Answer Posted / santosh singh

M20


M means design mix
And 20 is characteristic compressive strength of concrete after 28 days.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to preaper for interview wat they asked in interview give me idea

2171


Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??

2234


2. What are the advantages of your present job, things you like about it?

2709


How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)

1292


why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?

10205






how much of the strength comes from post-production curing

2263


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

1695


Please design 12.5m long dubbly beam

1472


how to calculate the size of triangular ring in rcc column?

1352


How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?

1873


material used for mendrel use to bend epoxy coated rebar

1845


What is the material consumption- cement,sand,tiles etc for Toilet dado?

7050


Explain the difference between slab and beam?

664


What do we mean by partial moment release ??

3363


what is your role of in previous company as a construction manager

1567