calculate if the size of the beam is 300*500 then L for the top & bottom bar
Answer Posted / vijay
ans. is 425 but how explain it..
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
though u r a civil engineer, y r u interested in tcs???
What are the uses of alloys in daily life and how are alloys made?
A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.
Can we apply curing compound on ceiling (slab Bottom)
Define What glue is least sticky?
what is moment-curvature relationship in semi rigid connections??
What is the tallest man made structure in the world?
how to create our resume?
what is the service corridor?
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
may i know the detailed description of cutting length