calculate if the size of the beam is 300*500 then L for the top & bottom bar
Answer Posted / vijay
ans. is 425 but how explain it..
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
five requirements of infill panels for walls?
What is meaning of FREE STANDING STAIRCASE ?
Cement consumption of one cubic meter of aerocon blocks masonry?
what is the effect of duration of earth quake on framed structures ?
what are the changes in concrete pour height as per IS 456, 2009?
What is the substitute of Mastic Asphalt?
How and where are aqueducts built?
Explain what is Critical Path Method (C.P.M)?
What expenses counted in contingencies and how much it is in related to built-up area of the building.
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
How much quantity of cement,sand,stone used to build 1 cum of cc road??
For Wet Mix Mecadam design what is Optimum moisture content
why we can use dust in concrete insted of fly ash