calculate if the size of the beam is 300*500 then L for the top & bottom bar
Answer Posted / vijay
ans. is 425 but how explain it..
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
who to find building iron rod strenth
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
Which percentage of carpet area use in plot area of office building.
Explain creep?
what is the specific gravity of rubble in plum concert
List out some of the software program that can be useful for architect?
how to find quantity of concrete in PCC M15
What is the coeffiencent Friction Angle between Steel and Ashphalt?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
What is the development length given in pile?
What is a bearing capacity of soil?