how can u extent the final setting time of cement?
Answer Posted / rahul
by adding gypsum in clinker
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is the effect of duration of earth quake on framed structures ?
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
what is the percentage of silt in black cotton soil.?
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
What will you do if you encounter problems like accidents?
What is hybrid foundation?
what is mc arther pile?
What is bmc stands for in bmc software?
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
What is made from large rocks, which protects the base of cliffs?
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
What is meant by cartesian coordinate system?
why is M30 grade Concrete use for Foothing & Column M50
How much cement and sand required for 9"brick wall per square metre