What are the methods to do a estimate.
Answer Posted / suresh s sonone
1.detailed estimate
2.supplimentary estimate
3.revised estimate
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
Design a rectangular channel.
What is meant by a context menu in a cad software?
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
Did any of the egyptian pyramids ever fall down?
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
How you can use different dimension tools in cad? What are the different dimensions available?
how to identify np3 pipe and np4 pipe
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
how can we calculate steel value, depending on load
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?