Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what should be the quantity of water in m20 cocnrete /per
bag cement-- whats the formula

Answer Posted / abdul samad

The W/C Ratio generally varies from 0.3 to 0.6, But preferable is 0.5 if your mix is not designed one. otherwise it is suggested by the designer.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?

1112


What are the uses of layer?

1305


what is mean by reestimation?

1797


Different sizes of Hollow blocks and its weight. Thanks.

2407


CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL

2143


The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?

2209


minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?

5414


can stub column take the load as main column

1895


What is gravity flow?

1179


What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?

2406


Explain how you can use different dimension tools in CAD? What are the different dimensions available?

1081


Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice

2633


is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.

1942


how clculate excavated or backfilling quantity by simpson's rule

5116


List out some of the common problems that architect have to tackle it?

1064