Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / abdul kohinoor
a+b
where a= l*b*h
b= h/3[(A1*A2)+underrood A1+A2
Is This Answer Correct ? | 4 Yes | 6 No |
Post New Answer View All Answers
Define different types of roof systems?
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
about higyway engineering
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
strength vs shape factor
Define What is aggregate?
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building
What is the purpose of the gap in the road on this bridge?