clean earthing and dirty earthing
Answer Posted / narayan rijal
to increase workability
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
What is progress payment?
What is meant by autocad?
how to estimate material requirement for an area of house in square feet?
how to determine H- zone in a column? where it will occur?
What is the density of DLC & PQC and how it is differ from normal concrete?
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
How to decide/consider the grade of bitumen for dbm.
how to check and keep control on the wastage of material at site
what is the criteria for the finalisation of pavement thickness in road project?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
What is difference between code and standard and specification?
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg