clean earthing and dirty earthing

Answer Posted / narayan rijal

to increase workability

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.

2136


What is progress payment?

700


What is meant by autocad?

653


how to estimate material requirement for an area of house in square feet?

1733


how to determine H- zone in a column? where it will occur?

1758






What is the density of DLC & PQC and how it is differ from normal concrete?

2993


Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......

1722


How to decide/consider the grade of bitumen for dbm.

1765


how to check and keep control on the wastage of material at site

1853


what is the criteria for the finalisation of pavement thickness in road project?

1587


what is Quantity of stone and sand required for one cubic meter of stone work (UCR)

1638


What is difference between code and standard and specification?

1794


is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.

1572


What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.

2133


PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg

1861