Answer Posted / prashanth
First understand the span.
Thickness of the slab.
Normally per Sft 4 to 5 kgs of the steel will consume.
| Is This Answer Correct ? | 2 Yes | 7 No |
Post New Answer View All Answers
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
What is the Roll of Water Bonding under VDF road?
What is the difference between a wood shake and wood shingles?
What is the procedure of concealed plumbing in toilets?
which type of instrument included in plumbing work?name of instrument?
Define current ucs?
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
What do you mean by honeycomb in concrete?
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
what is mean by c32/40s concrete class