Answer Posted / alan savio
It is only a protection layer for RCC from earth surface. You can also lay a polythene sheet over PCC to avoid slurry lose from RCC.
| Is This Answer Correct ? | 4 Yes | 5 No |
Post New Answer View All Answers
What Are The Steps Involved In The Concreting Process, Explain?
Why does the pressure increase under soil?
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
Explain what is the difference between built area and super built up area?
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
The 4 main factors to start a construction project are––
How is improve my knowledge in construction industries....
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
In case if concrete box girder bridges how is the number of cells determined?
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
how to calculate the scour depth
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?
difference between fc and fc'?
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa