Answer Posted / rahul attarkar
The term M20 in Civil Engineering is nothing but the Grade of Concrete. In this 'M' defines Mix and '20' is compressive strangth of concrete after 28 days curing.
| Is This Answer Correct ? | 24 Yes | 1 No |
Post New Answer View All Answers
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
How to marking the building
how many time use of plywood shuttering and IS code
Why should pumping be not used in case of concreting works?
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
What is the exception critarea of cube?
how to do cementicious paint for rcc walls of cw pump house
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
What is the zero value in quantity surveying
Please tell me vasthu room sizes. Thanks.
Which type of plywood & sizes using in construction projects ?
how to calculate freeboard in under ground water tank and technical details
what is the function of GSB all class ?