Answer Posted / rahul attarkar
The term M20 in Civil Engineering is nothing but the Grade of Concrete. In this 'M' defines Mix and '20' is compressive strangth of concrete after 28 days curing.
| Is This Answer Correct ? | 24 Yes | 1 No |
Post New Answer View All Answers
Define What are the uses of Groynes?
detailed calculation of the amount of cement used?
How much cement and sand required for 9"brick wall per square metre
Explain what is 1/8 on the architect ruler denotes?
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
how statics is different from dynamics
what is tension column?
What is limit state method and working stress method and ultimate method
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
What is geopolymer based concrete?
what is Brest Wall?
What is the l/d ratio of cantilever beam?
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
How to calculate 1 brss for RCC work