what is M20 ? 

Answer Posted / rahul attarkar

The term M20 in Civil Engineering is nothing but the Grade of Concrete. In this 'M' defines Mix and '20' is compressive strangth of concrete after 28 days curing.

Is This Answer Correct ?    24 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)

1506


What is quantity of cement and sand required for 2000sqft of tiling?

2391


Define a polyline?

681


There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?

977


Coverage of 25mm.thick ratio of 1:4 cement mortar?

1407






What are the advantages of cad software?

655


what is the water-cement ratio of mix design while 30mpa in 7 days?

2629


What are the alternate material for steel, Sand and aggregate

1828


You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.

1743


how to do sudoko puzaals?

1831


what is relation between SPT N value and driving piles after conducting a soil test?

1578


What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?

1959


how to calculate valuation for the old building?

1807


Difference between lime, distemper and plastic emulsion?

1233


How to determine spacing of bars in slabs or beams

1972