Answer Posted / rahul attarkar
The term M20 in Civil Engineering is nothing but the Grade of Concrete. In this 'M' defines Mix and '20' is compressive strangth of concrete after 28 days curing.
Is This Answer Correct ? | 24 Yes | 1 No |
Post New Answer View All Answers
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
What is quantity of cement and sand required for 2000sqft of tiling?
Define a polyline?
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
Coverage of 25mm.thick ratio of 1:4 cement mortar?
What are the advantages of cad software?
what is the water-cement ratio of mix design while 30mpa in 7 days?
What are the alternate material for steel, Sand and aggregate
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
how to do sudoko puzaals?
what is relation between SPT N value and driving piles after conducting a soil test?
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
how to calculate valuation for the old building?
Difference between lime, distemper and plastic emulsion?
How to determine spacing of bars in slabs or beams