Answer Posted / timmareddy
on which basis u want to check ,..like sand , cement , steel;ect
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How much cement and water required for cement selery????
how much used soil in 1 brick of standard size?
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
what is tension footing?
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
what is difference between GTS bench mark and temporary bench mark
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
crank types
What is meant by autocad?
how to calculate rate analysys of 1:6 plastering 10 sq m
How much cement,sand,bricks and water needed for 1square metre brick work?
What is Rankine Cycle?
What is Refuse Area In High Rise Building ?