how sir calculate the slab steel and sir i want to know
that how i calculate shutter works payments in cum and the
rate is 120 per cum
Answer Posted / venu gopal
Generally shuttering will calculate in SQm/SQft . First u have to know the Dimensions of the member (column/beam etc..) then calculate the area of the member ..that area multiplies with thichness wii gives u the Volume of shuttering
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is the meaning of a blue land surveyors flag?
Minimum concrete cover in slabs, columns, beams, foundation and other st?
what is moment-curvature relationship in semi rigid connections??
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
VAT and CST ? Which benefits for buyer ? Why benefits?
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
What is the density of most of construction materials?
Minimum and maximum size of the building components
what is differences between ferrock and concrete ?
In cement concrete how to check a quality of material also proportion of material at site ?
What is command line?
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
What is Heavy Concrete & Normal Concrete
What are the alternate material for steel, Sand and aggregate